Four steps, start to finish
Old patches taken off and the detail rebuilt, and a written quote for every job before any work starts.
Call with the address and what you see
A stain, a drip, shingles in the yard, a soft spot on a flat roof.
Look before any price
The slopes and the details that fail, then the attic where there is one.
The roof in writing
What failed, what is under the old repairs, what each option is estimated to cost, and what can wait.
The work, then the walkaround
Old patches off, the detail rebuilt, photographs before and after, and a walk around the finished job before the final payment.
All of it, priced
Estimated ranges for Los Angeles County homes. Your own written quote comes after we have seen it.
Roof Replacement - $5,000 - $10,500 (est.)
Downey's published asphalt average; statewide $15,000 - $55,000.
Roof Repair - $350 - $1,800 (est.)
California minor repairs; major $1,800 - $5,000+.
Roof Leak Repair - $350 - $1,800 (est.)
Tracing the entry point included.
Emergency Roof Repair - $350 - $1,800 (est.)
The permanent repair; temporary cover quoted on its own first.
Storm Damage Roof Repair - $350 - $5,000+ (est.)
California minor to major repair bands.
Flat Roof Repair - $750 - $3,500 (est.)
California range for flat roof repair.
What to gather before a roofer arrives, and why it saves time
On an old roof, what was done before decides what gets done now.
Catch any water and photograph it
A bucket under the drip, belongings moved, and dated photographs of the stain before anything is touched.
Note what has been done before
Any patch you know about, when the roof was last redone, and the permit record if you have it.
Look in the attic if you safely can
Water tracks on the rafters, damp insulation or daylight around a vent point straight at the entry, and a found entry point is a cheaper repair.
Count the roofs on the lot
A garage, a rear addition or a back unit each has its own roof. Say so on the call, so each one can be looked at and priced on its own line.
The first storm sets the roofing calendar here
Worth knowing before you start calling around, because the busiest weeks are the worst weeks to be choosing.
Lynwood's rainy season runs from about October to April, with February the wettest month, and local roofers describe summers that push into the 90s for weeks. A roof can go a whole summer untested, so the leaks it has been saving arrive together, across the city, with the first heavy rain.
That is also when old patches let go, because sealant that dried out over the summer is the first thing a storm finds. A repair made in the dry months, with the old patch taken off properly, is the cheapest one this roof will ever get.
- Active leaks covered the same day where light and weather allow
- Old patches rebuilt in the dry months where possible
- Temporary cover quoted separately from the permanent repair
- Replacements scheduled before the rainy season

Want a figure on it?
The estimated range before we travel, and the figure in writing before any work starts.